What this source contributes.
Examines fog-monitor sampling and sizing uncertainties. It supports instrument qualification and loss corrections; it does not validate a particular charged-droplet sampling arrangement.
Primary methods and uncertainty discussion reviewed in the Weatherhill evidence audit.
Primary material consulted
This is a bounded reading note. It is not independent replication, a full systematic review or an endorsement of every conclusion in the paper.
Questions to take to the paper
- Is the upstream reference matched to the downstream transit time?
- Which uncertainty components are random, and which are bounded biases?
- What is independently prepared: a reading, a run or a day?
A simulation, chamber result, field observation and operational outcome answer different questions. Record the comparator, measured quantity and conditions before carrying a result into a design.
Bibliographic provenance
Verified 2026-10-11 against the publisher-deposited metadata record. Publication dates retain the precision supplied by the publisher. Metadata may reflect digital republication; it is not always the earliest historical publication date.